我欲封天txt下载,玄幻小说改编的电视剧,完美世界txt下载 http://cccatv.cn/en Thu, 12 Dec 2024 09:04:42 +0000 en-US hourly 1 https://wordpress.org/?v=4.6.1 Shandong Fuyuan rooftop distributed solar project http://cccatv.cn/en/cases/1893 Thu, 08 Jun 2023 08:50:07 +0000 http://cccatv.cn/?p=1893 項目名稱

山東福源屋頂分布式太陽能光伏并網(wǎng)發(fā)電站項目

建設(shè)單位

濟南恒力新能源科技有限公司

裝機方案

裝機容量為3MW,年預(yù)發(fā)電量300萬度

工作范圍

32000平方屋頂建設(shè)光伏發(fā)電站項目

項目日期

2022年11月

項目簡介

項目位于濟南市長清區(qū)山東福源鍋爐有限公司院內(nèi),主要利用山東福源公司原廠房、接建廠房、新建廠房、辦公樓等約計32000平方屋頂建設(shè)光伏發(fā)電站。擬裝機容量為3MW,年預(yù)發(fā)電量300萬度,太陽能光伏并網(wǎng)最大限度減少污染物排放和能源消耗,有利于推動當(dāng)?shù)乜諝猸h(huán)境質(zhì)量持續(xù)改善。

]]>
(中文) 山東費縣生物能能源化綜合利用項目 http://cccatv.cn/en/cases/1313 http://cccatv.cn/en/cases/1313#respond Sun, 22 Dec 2019 10:47:26 +0000 http://cccatv.cn/?p=1313 Sorry, this entry is only available in 中文.

]]>
http://cccatv.cn/en/cases/1313/feed 0
Exhaust waste heat recycling and wet peak cooling of Shanxi Linfen http://cccatv.cn/en/cases/129 http://cccatv.cn/en/cases/129#respond Mon, 09 May 2016 12:04:52 +0000 http://cccatv.cn/?p=129 Continue reading "Exhaust waste heat recycling and wet peak cooling of Shanxi Linfen"]]> 2016050914

Project

Exhaust waste heat recycling and wet peak cooling of Shanxi Linfen Thermoelectricity Co., Ltd

Constructing company

Shanxi Zhangze Power-saving Technology Co., Ltd

Constructing scale

3 absorption heat pump sets of 38.36MW and the supporting facilities; peak cooling system is designed to cool 35% emission of 2 turbines of 300MW, which is 240t/h.

Working range

primary designing, working drawings and completing drawing designing.

Period of project

August 2015

Project introduction

2 air-cooled heat generators are installed in Shanxi Linfen Thermoelectricity Co., Ltd. Insufficient space for heat transfer in air-cooling island has led to high back pressure of the machine and high consumption of power-generating coal. 2 front condensers and 3 absorption heat pumps of 38.36MW are designed to centrally supply heat by recycling heat produced by condensed exhaust in winter and cool off the temperature by distributing exhaust, thus sharply reducing coal consumption for power generating and supplying heat from the power plant and enhancing its capability of supplying heat.

]]>
http://cccatv.cn/en/cases/129/feed 0
New Energy Cogeneration reconstruction Project(EPC) of Shansheng, inner Mongolia http://cccatv.cn/en/cases/126 http://cccatv.cn/en/cases/126#respond Mon, 09 May 2016 12:02:28 +0000 http://cccatv.cn/?p=126 Continue reading "New Energy Cogeneration reconstruction Project(EPC) of Shansheng, inner Mongolia"]]> 2016100701

Project

New Energy Cogeneration reconstruction Project(EPC) of Shansheng, inner Mongolia

Constructing company

Suzhou Hanfeng Technology Development Co., Ltd

Constructing Scale

2X32.45MW absorption heat pump sets and supporting project

Working range

EPC overall contractor

Period of project

January 2015

Project introduction

Other shining points worth introducing: The capability of Inner Mongolia Shansheng New Energy heat-generated power factory is 2XC50MW hydro-cooling heating sets whose condensed heat is discharged from the cooling tower into the atmosphere, heat provided by set extraction. 2 absorption heat pump sets of 32.45MW are placed and recycle cooled heat to supply centralized heat. It realizes the utilization of using waste heat to supply heat and at the same time strengthens the power supply capacity of the power plant and sharply reduces coal consumption for heating. The project is overall contracted by our company, which has smoothly passed the acceptance.

]]>
http://cccatv.cn/en/cases/126/feed 0
10MW Roof-scattering PV Power Project of Heze Jingke http://cccatv.cn/en/cases/114 http://cccatv.cn/en/cases/114#respond Mon, 09 May 2016 11:43:18 +0000 http://cccatv.cn/?p=114 Continue reading "10MW Roof-scattering PV Power Project of Heze Jingke"]]> 201605091002 201605091001

Project

10MW Roof-scattering PV Power Project of Heze Jingke

Constructing company

Jingke Energy Holdings Co., Ltd

Equipping plan

10MW Roof PV power project

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2015

Project introduction

100 million yuan invested, the project has been put into manufacture since June 2015. Its unique features are agricultural light complementation, renting land to build PV project to maximize benefits and optimize investment.

]]>
http://cccatv.cn/en/cases/114/feed 0
Town Anlin 20MW deserted mountain PV power station of Feicheng Xingyu Solar PV technology Co., Ltd http://cccatv.cn/en/cases/111 http://cccatv.cn/en/cases/111#respond Mon, 09 May 2016 11:39:04 +0000 http://cccatv.cn/?p=111 Continue reading "Town Anlin 20MW deserted mountain PV power station of Feicheng Xingyu Solar PV technology Co., Ltd"]]> 2016050909

Project

Town Anlin 20MW deserted mountain PV power station of Feicheng Xingyu Solar PV technology Co., Ltd

Constructing company

Feicheng Xingyu Solar PV technology Co., Ltd

Equipping plan

20MW PV power project

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2014

Project introduction

190 million yuan invested, the project has been put into manufacture since June 2014. Its unique feature is utilizing deserted mountain to take the full advantage of productive benefits from land resources on the largest scale.

]]>
http://cccatv.cn/en/cases/111/feed 0
Town Anjiazhuang 25MW agricultural PV power station of Feicheng Huichuang Solar PV Technology Co., Ltd http://cccatv.cn/en/cases/107 http://cccatv.cn/en/cases/107#respond Mon, 09 May 2016 11:35:30 +0000 http://cccatv.cn/?p=107 Continue reading "Town Anjiazhuang 25MW agricultural PV power station of Feicheng Huichuang Solar PV Technology Co., Ltd"]]> 201605090802 201605090801

Project

Town Anjiazhuang 25MW agricultural PV power station of Feicheng Huichuang Solar PV Technology Co., Ltd

Constructing company

Feicheng Huichuang Solar PV Technology Co., Ltd

Equipping plan

25MW PV power project

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2015

Project introduction

240 million yuan invested, the project has been put into manufacture since June 2015. Its unique features are agricultural light complementation, renting land to build PV project to maximize benefits and optimize investment.

]]>
http://cccatv.cn/en/cases/107/feed 0
Project: Generating power by burning living rubbish of Yulin, Guangxi http://cccatv.cn/en/cases/104 http://cccatv.cn/en/cases/104#respond Mon, 09 May 2016 11:31:11 +0000 http://cccatv.cn/?p=104 2016050907

Project

Generating power by burning living rubbish of Yulin, Guangxi

Constructing company

Yulin Chuanneng Huaxi environmental-friendly Power Generating Co., Ltd

Equipping plan

3X400t/d mechanical grate boiler+2X15MW turbo generator sets

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2015

]]>
http://cccatv.cn/en/cases/104/feed 0
Combined heat and power generator in Lianghe District of Shandong Mingke Energy Saving Engineering Co., Ltd http://cccatv.cn/en/cases/101 http://cccatv.cn/en/cases/101#respond Mon, 09 May 2016 11:27:28 +0000 http://cccatv.cn/?p=101 Continue reading "Combined heat and power generator in Lianghe District of Shandong Mingke Energy Saving Engineering Co., Ltd"]]> 2016050906

Project

Combined heat and power generator in Lianghe District of Shandong Mingke Energy Saving Engineering Co., Ltd

Constructing company

Shandong Mingke Energy Saving Engineering Co., Ltd

Equipping plan

2 biomass CBF boilers with high temp and high pressure+2 15MW turbo generator sets sets supplying heat by extracting and condensing with a total capability of 30MW

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2014

]]>
http://cccatv.cn/en/cases/101/feed 0