山東福源屋頂分布式太陽能光伏并網(wǎng)發(fā)電站項目
濟南恒力新能源科技有限公司
裝機容量為3MW,年預(yù)發(fā)電量300萬度
32000平方屋頂建設(shè)光伏發(fā)電站項目
2022年11月
項目位于濟南市長清區(qū)山東福源鍋爐有限公司院內(nèi),主要利用山東福源公司原廠房、接建廠房、新建廠房、辦公樓等約計32000平方屋頂建設(shè)光伏發(fā)電站。擬裝機容量為3MW,年預(yù)發(fā)電量300萬度,太陽能光伏并網(wǎng)最大限度減少污染物排放和能源消耗,有利于推動當(dāng)?shù)乜諝猸h(huán)境質(zhì)量持續(xù)改善。
]]>Exhaust waste heat recycling and wet peak cooling of Shanxi Linfen Thermoelectricity Co., Ltd
Shanxi Zhangze Power-saving Technology Co., Ltd
3 absorption heat pump sets of 38.36MW and the supporting facilities; peak cooling system is designed to cool 35% emission of 2 turbines of 300MW, which is 240t/h.
primary designing, working drawings and completing drawing designing.
August 2015
2 air-cooled heat generators are installed in Shanxi Linfen Thermoelectricity Co., Ltd. Insufficient space for heat transfer in air-cooling island has led to high back pressure of the machine and high consumption of power-generating coal. 2 front condensers and 3 absorption heat pumps of 38.36MW are designed to centrally supply heat by recycling heat produced by condensed exhaust in winter and cool off the temperature by distributing exhaust, thus sharply reducing coal consumption for power generating and supplying heat from the power plant and enhancing its capability of supplying heat.
]]>New Energy Cogeneration reconstruction Project(EPC) of Shansheng, inner Mongolia
Suzhou Hanfeng Technology Development Co., Ltd
2X32.45MW absorption heat pump sets and supporting project
EPC overall contractor
January 2015
Other shining points worth introducing: The capability of Inner Mongolia Shansheng New Energy heat-generated power factory is 2XC50MW hydro-cooling heating sets whose condensed heat is discharged from the cooling tower into the atmosphere, heat provided by set extraction. 2 absorption heat pump sets of 32.45MW are placed and recycle cooled heat to supply centralized heat. It realizes the utilization of using waste heat to supply heat and at the same time strengthens the power supply capacity of the power plant and sharply reduces coal consumption for heating. The project is overall contracted by our company, which has smoothly passed the acceptance.
]]>10MW Roof-scattering PV Power Project of Heze Jingke
Jingke Energy Holdings Co., Ltd
10MW Roof PV power project
primary designing, working drawings and completing drawing designing.
2015
100 million yuan invested, the project has been put into manufacture since June 2015. Its unique features are agricultural light complementation, renting land to build PV project to maximize benefits and optimize investment.
]]>Town Anlin 20MW deserted mountain PV power station of Feicheng Xingyu Solar PV technology Co., Ltd
Feicheng Xingyu Solar PV technology Co., Ltd
20MW PV power project
primary designing, working drawings and completing drawing designing.
2014
190 million yuan invested, the project has been put into manufacture since June 2014. Its unique feature is utilizing deserted mountain to take the full advantage of productive benefits from land resources on the largest scale.
]]>Town Anjiazhuang 25MW agricultural PV power station of Feicheng Huichuang Solar PV Technology Co., Ltd
Feicheng Huichuang Solar PV Technology Co., Ltd
25MW PV power project
primary designing, working drawings and completing drawing designing.
2015
240 million yuan invested, the project has been put into manufacture since June 2015. Its unique features are agricultural light complementation, renting land to build PV project to maximize benefits and optimize investment.
]]>Generating power by burning living rubbish of Yulin, Guangxi
Yulin Chuanneng Huaxi environmental-friendly Power Generating Co., Ltd
3X400t/d mechanical grate boiler+2X15MW turbo generator sets
primary designing, working drawings and completing drawing designing.
2015
]]>Combined heat and power generator in Lianghe District of Shandong Mingke Energy Saving Engineering Co., Ltd
Shandong Mingke Energy Saving Engineering Co., Ltd
2 biomass CBF boilers with high temp and high pressure+2 15MW turbo generator sets sets supplying heat by extracting and condensing with a total capability of 30MW
primary designing, working drawings and completing drawing designing.
2014
]]>